Downstairs Bathroom Remodel Pt 1
Downstairs Bathroom Renovation (Part 1)
Materials
- 3x5" tile (appx 90sf)
- Mosaic Tile (appx 12sf)
- 1/2" cement Backerboard (Appx 150sf)
- 1/4" cement backerboard (1 sheet)
- Toilet
- Vanity
- Drywall
- Plastic sheeting
- 4x24" ceramic tile (appx 35sf)
- Mirror
- Various building materials (screws, thin-set, grout, ect)
- Plumbing items
- Plywood
- Faucet
- Shower/tub faucet and valve
Tools
- Cordless drill
- Hammer
- Saw
- 3/8" square-notched trowel
- 1/4" square-notched trowel
- 1/2" PEX fittings
ADHDiY labor
Planning: 20 Hrs
Demolition: 16 Hrs (solid weekend)
Installation: 80 Hrs (over several months)Demolition: 16 Hrs (solid weekend)
Finishing: Weeks!
Cost: $2,500
The start of the Project House. This was the first remodel that we conducted. While it wasn't the longest, it definitely tested our DiY skills, and left us with many lessons learned, specifically the need for proper tools.
It was small and dark. The existing bathroom had a cheap fiberglass insert, with vinyl flooring and a reused vanity and light. It had an avocado green paint that covered what was siding. The siding extended throughout the kitchen, laundry room, and mud room.
It was a total removal and gut. The demolition took a weekend, including removal of the flooring down to the subfloor.
Some re-framing to 16" on center was needed for the ceiling in the mud room and downstairs bath.
As the bathroom downstairs was an addition, plumbing had been extended from the upstairs bath.
More to continue!